Mike Kushy, Lee Venning and Trevor Hughes. MK and LV to begin with and no water at the bottom. Started at 10.30. We both took turns with capping kit. It does work but slow progress in the conglomerate. A nice band of pink calcite coming out today. MK winched and LV filled buckets, 10 loads. We then met TH at the pub for lunch and to get materials. MK drilled and set up whilst LV watched. TH wired up the det. All filled and fired fine. Mike.
TempleTwin
Sunday, 29 March 2026
Friday, 20 March 2026
Friday 20th March 2026
Mike Kushy and John Cooper. Breaker work with MK in the hole and JC winching, 21 buckets cleared. A new hole to the North has been exposed that provides an overflow for the puddle, about 10l of water was bailed into this and it swallowed the lot. More breaker work to be done. 2 1/2 hours. Mike.
![]() |
| Drain Hole in Floor. Photo MK. |
Friday, 27 February 2026
Friday 27th February 2026
Tuesday, 24 February 2026
Tuesday 24th February 2026
John Cooper and Mike Kousiounis. Warm, 12°C and sunny, with little wind. John at the bottom with the breaker to start, with Kushy hauling. After the third breaker session John came up and Mike went to the bottom to clear. Then he continued with the breaker. Total loads for the day was 29. Finally holes drilled and destroyed. Should be more spoil ready for clearing next session. The bottom rung on the ladder is now nearly 2m off the floor making getting on and off quite interesting! 4½ hours. John.