John Cooper, Trevor Hughes, Mike Kousiounis and Lee Venning. Spoil clearing session, started around 2pm. Trevor started by sorting out some pipe for use with his extractor fan. Meanwhile Kushy was at the bottom loading, John hauling and Lee emptying. After 30 loads Lee went down with his breaker and Trevor took over emptying the buckets. At 56 loads hauled out Mike and Lee took a break. They reported loads more to come out. John then left. John.
|
| Bottom, looking South. Photo MK. |
|
| Today's haul. Photo LV. |
After a break we measured the depth at 13.7m (we haven't cleared the floor in weeks). A small ladder was lowered and 5 holes drilled to trim the wall in various places. All 10mm holes, 3 x 1m and 2 x 500mm. The objective was to give better ladder placement and fewer places for the bucket to snag when raising and lowering. Task completed and finally the extractor fan was tested with a successful result. Supervised setup for LV, cold and draughty for MK supervising. Finished just after 6pm. Mike.
|
| Lee drilling. Photo MK. |
|
|
| Fumes being extracted. Video MK. |