Mike Kushy and Lee Venning arrived on site at 11am. The weather was overcast but the sun soon put in an appearance. After adapting the extractor fan to use the new 2 inch air pipe MK headed down equipped with the breaker and got to work removing loose rock and mud from the floor and walls. After LV had winched twenty-four loads to the surface we decided to stop for lunch; this was about 1pm.
Once lunch was done MK and LV went down again and got to work drilling holes. Trevor Hughes and John Cooper arrived about 1:40pm but JC didn’t hang around as there wasn’t much for him to do.
We drilled 5 x 500mm holes and 1 x 250mm hole, all 12mm diameter (The 1m drill bit entered a void after about 250mm and this void continued the remaining 750mm of the drill bit). MK then supervised LV who did the set-up, with TH providing surface support. Once the set-up was complete, we retreated to the surface and the holes were destroyed.
Depth measured at 15m.
We all left site at 3:15pm. 4¼ hours. Lee.
|