Mike Kushy. Did some pf work at the dig face. Big lumps removed fairly easily. Several buckets cleared. Nice calcite layers sloping down to the South. 4 hours. Mike.

Looking down on dig face, northern end where the crowbar is. Photo MK.

Looking south, where the calcite layers slope to. Photo MK.

Thursday, 15 May 2025

Thursday 15th May 2025

Mike Kushy and John Cooper. MK to begin with, got to site at 10.30. Wheelbarrowed a load of hardcore from the spoil pile around the back and tipped it behind the eastern wall where the winch will be going. Made a mix around lunchtime and started building up around the southern steel. JC arrived not long after and did some more wheelbarrowing of hardcore. MK chucked irregular shaped rocks behind the eastern wall to bulk it up. The pair then shifted a steel I beam to the dig to go on the northern end. We then concentrated on packing around the steel and checking levels. JC moved some mud from the top of the Templeton spoil heap down to fill the gap left from hardcore taken. MK laid grid metal sheet down to check heights. Left at 4pm. Mike.

Trial setup. Photo MK.

Trial setup. Photo MK.

Sunday, 11 May 2025

Sunday 11th May 2025

Mike Kushy. Took winch apart at White Rabbit's Hole and moved it up to Templetwin with trailer. Moved a few buckets of hardcore behind the walls. 2 hours. Mike.

Monday, 5 May 2025

Monday 5th May 2025

 Mike Kushy. 2 mixes made and used setting out pad height for steels to go in. 3 hours. Mike.

Photo MK.

Photo MK.

Wednesday, 30 April 2025

Wednesday 30th April 2025

Mike Kushy. Did a run of rock from WRH to add to that JC delivered yesterday then made 1 mix to build up the walls some more. Very hot weather. 2 hours. Mike.

Monday, 28 April 2025

Monday 28th April 2025

Mike Kushy. Arrived at 11am and picked up a load of rock from WRH. Made a mix and carried on from yesterday. JC popped by with another 3 bags of cement and moved some rocks from my car to the site. Another mix made and used. Concentrated on building up the pillars for the steel lintel to go in. 5 hours. Mike. 

West wall pillar. Photo MK.

North wall pillar. Photo MK.

View from the East. Photo MK.

Sunday, 27 April 2025

Sunday 27th April 2025

Mike Kushy. Arrived at 11am and picked up a load of rock from WRH. Moved this to the dig to join a big load of rock John Cooper dropped off yesterday. This was enough for 3 mixes which was used building up the North and West walls. Spent the rest of the day bulking up the corners and pillars with clean stone. 6 hours. Mike.

View from the East. Photo MK.

West wall pillar. Photo MK.

View from the West. Photo MK.