Monday, 31 March 2025

31st March 2025

Mike Kushy. Continuing wall building, 2 mixes. 2 layers of wall built now and some of the larger blocks propped. 3 hours. Mike.

Dinner after first mix, Photo MK

End of session. Photo MK.

Sunday, 30 March 2025

30th March 2025

Mike Kushy, Mike Wise, Dave Walker, Tom Franklin. MW down the hole, MK hauling and DW taking buckets to spoil heap. TF got some photos, then he replaced MK whilst MK went rock hunting for wall rock. TF had a go at the sharp end and loads removed. A decent hole at the bottom and all agree on the presence of a draught coming out. We decided to make a mix and DW stayed on with MK to build the walls to the sides up and add drainage pipe. 4 hours. Mike.

Saturday, 15 March 2025

15th March 2025

Mike Kushy and David Morrison. Lower steels fitted and made a start on retaining walls. Mike.

Photo MK.

Photo MK.

Friday, 14 March 2025

14th March 2025

Mike Kushy and David Morrison. Higher retaining steels fitted, needs pinning and wall built up to them.

Photo MK.

Saturday, 8 March 2025

8th March 2025

Mike Kushy, David Morrison (Tuska) and 'Frank The Tank'. Templetwin is born. Birth was eased with use of the Kubota. 6/7ft soil and small fill, then the digger got another 7/8ft deeper. 2 boulders too large were reduced in size, courtesy of Dr Noble. The digger was then able to lift these out. Steps cut into the dirt and the site tidied up. Looking overall stable, but needs some reinforcing. Started work on fencing. Mike.

Photo MK.