John Cooper. Two mixes of cement used adding to access pit wall. Only
material left is 1/3 bag of cement. 2 hours. John.
![]() |
Close-up View. Photo JC. |
![]() |
Wider View. Photo JC. |
John Cooper. One mix of cement used adding to access pit wall. 1½ hours. John.
John Cooper. Took up some water but the tub has filled up with recent
rain so not needed at present. Two mixes of cement used adding to access pit
wall. Second mix larger than planned as it started much too wet! Need some
local rocks. 3 hours. John.
![]() |
Midway through session. Photo JC. |
![]() |
End of session. Photo JC. |
Michael Kousiounis and John Gisborne. With JG mixing and MK wall building, 3 mixes used to continue with the ladder pit. A tad wet. 2 hours. Mike.
Mike Kushy, John Cooper and John Gisborne. MK to begin with. Made a mix and carried on with the ladder pit wall. Then a go at pf work down the bottom. JC turned up around 2ish and we cleared anything loose from the dig face. JG showed up aroud 3ish and took over from JC hauling, a dozen or so more buckets removed. We may have to start looking at using a breaker or HE soon. Mike.