Mike Kushy and Lee Venning arrived on site at 10.45am. The weather was sunny and warm. We set the extractor up and then LV headed down to fill buckets while MK was on winch duty. After about 15 x buckets had been winched to the surface MK was joined Mikey Waterworth (MW). Once 30 x loads had been winched topside LV returned to the surface, with MW replacing him down the shaft armed with the small breaker. MW stayed underground until we reached a total of 48 buckets.
We stopped for lunch as it was 2pm already and afterwards MK went down shaft to continue work with the breaker, after a further 10 loads we called it a day.
We all left site at 3:15pm, 4 ½ hours, Lee.
Total Buckets Removed x 58
|
| Base at end of session. Photo MK. |
|
| Loads hauled up today. Photo LV. |