Mike Kushy, David Morrison and John Cooper. MK and DM to start with, we met around 10.30 am. We installed a working platform out of 4 inch waste pipe set in the wall and fence posts inserted, the other end sat on the natural rock shelf. The 4 inch pipe can stay in for drainage. A pallet was laid on top to stand on. We then proceeded to wall building, with DM on the mixer and MK building the walls. JC arrived around 2.30pm and he started wall building with MK. JC concentrated on tying the south wall to the west wall. With a couple of pins put into the rock a board could be braced and building was then achievable. Lost count of how many mixes. We're running out of good building stone, but there's a few large loose boulders at the bottom to break up. We finished around 5.30pm. Mike.
 |
MK building up the eastern wall. Photo DM. |
 |
MK and JC wall building. Photo DM. |
 |
The end of the day. Photo MK. |