Sunday, 4 January 2026

Sunday 4th January 2026

AM - Mike Kushy and Lee Venning. LV went down the bottom to use the breaker with MK on surface hauling. 15 buckets. 2 hours. Mike.

View from the bottom looking up. Photo LV.

Looking at the floor, facing North. Photo LV.

PM - Mike Kushy and Trevor Hughes. TH drilled holes and MK set up. The floor is really odd and kind of crystalised so not sure what the outcome will be. 3 holes drilled and 2m of 40 used. Mike.

TH drilling. Photo MK.

No comments:

Post a Comment