Friday, 20 March 2026

Friday 20th March 2026

Mike Kushy and John Cooper. Breaker work with MK in the hole and JC winching, 21 buckets cleared. A new hole to the North has been exposed that provides an overflow for the puddle, about 10l of water was bailed into this and it swallowed the lot. More breaker work to be done. 2 1/2 hours. Mike.