Tuesday, 7 April 2026

Tuesday 7th April 2026

Mike Kushy, Lee Venning and John Cooper. We all met at 17.30. LV down the hole with JC winching and MK bucket carrying, 12 loads cleared. LV had a go at battery chiselling for a while and another 5 buckets brought out, LV said there is lots loose still at the dig face. With time short MK got to drilling for a charge around 1900. 1 whole stick in a 30x450mm hole (at the northern end, slightly higher up the wall to get a rising angle on the drill bit) and 1.6m of 40gm used over another 4 holes in the floor, you could tell the difference clearly on surface. Nearest farmer said he hadn't noticed a thing :) Off site for 2000. Mike.

All photo's by LV.

Spoil from Sunday. Looking North.

Loose stuff ready to come out of the floor.

More loose to chisel.

No comments:

Post a Comment