Sam Hill and Mike Kushy. MK arrived at 1645, emptied the dumper, ran the extractor down Templetwin for 15 minutes, tied the white pipe onto the ladder and lowered the telescopic ladder down. MK went down and found a good footing for the ladder (which is a perfect height) and filled 1 bucket up. MK came to surface and winched the bucket up. SH arrived at 1730 and went straight down the hole and with MK winching 36 loads were cleared. The breaker was brought out and SH had first go for 20 minutes or so. MK then went down the hole with SH winching. 55 buckets in total. Lots of mud to clear and more breaker work to be done. Finished at 1945. Mike.

All photo's MK.


Looking North, before clearing.

South before clearing.

Facing South and looking at the floor, before clearing.

South after clearing.