Friday 15th August 2025

Mike Kushy and Ed Ford. MK to begin with, set up the breaker and cables and got the genny going. MK did abut half hour on the breaker then EF took over. MK left EF to do breaker work and filled up some sacks of sand to go to White Rabbit. These were put in the lockbox and 2 bags of cement were taken up to Templetwin from WR. EF and MK took turns to breaker the pit and it looks double the width now almost all the way down, a good evenings clearing to be had. A bulge of rock came out from under the steel at the northern end, this needs extra pins put under one side of the lowest steel now as it's barely hanging on so caution advised. 3 hours. Mike.

MK's update on Youtube

End of session. Photo MK.