Afternoon. John Cooper and Mike Kushy. Cleared most of the spoil left at the bottom. Some of the larger boulders broken up with P/Fs. Now needs the breaker again to widen out the bottom section. Next time best not to choose a Wednesday afternoon when the generator is filling the hole with fumes. 2 hours. John.
Evening. Mike Kushy and Mike Waterworth. Supervised set up for MW. 12gm in 5 holes @ 500mm deep, 8 inches apart and following the already breakered out crescent shape. Very succesful and a good metre depth of slab peeled off. With MW hauling and MK filling we cleared as much as time would allow, 20 buckets, but still big boulders in the floor to be downsized. MW did a lidar video scan of the pit, our depth is just shy of 6m. 3 hours. Mike K.