Friday, 19 September 2025

Friday 19th September 2025

John Cooper and Mike Kushy. Kushy there before John who arrived about 13.30 to find Kushy trying to work out why the 110V breaker was misbehaving. After some fettling is was believed to be a break in the cable near where it enters the breaker. Got out the 240V one out instead. John did a session at the bottom but found it difficult so decided to clear first. 14 loads hauled out. Kushy then at the bottom who also found it difficult, possibly the rock is more solid now. At the end cleared the spoil plus a load of mud from in between the joints. Total of 33 loads hauled out today. Depth at the end of the session measured as 6.65m to top of red box section above deepest point. Visited by two young ladies from Bristol, Lucy and Hollie, who were interested in having a go at caving. Suggested CaveClimb or Wessex as suitable starting points. 4 hours. John.

No comments:

Post a Comment