Friday, 26 September 2025

Friday 26th September 2025

John Cooper and Mike Kushy. Both arrived about 13.15 with a repaired 110V breaker (was a dodgy bit of wire that John cut off). Overcast and cool today but dry. A good afternoon’s work with 60 loads of rock and mud being hauled out. Kushy did the first 2 sessions on the breaker then John did 1 before Kushy did a final one. Quite a bit of mud now being dug out. 4 hours. John.

Looking at North end floor. Photo MK.

Looking at South end floor. Photo MK.